Paper

FlexOps, the operating discipline behind flexibility

A short paper on why flexibility stalls after the pilot, and how to run it as a business. With a five-level maturity model and four metrics you can measure today.

Flexy, the Powernaut astronautFlexOps paper cover

The problem the paper starts from

Most flexibility is bought, then barely used

Great Britain in 2025: plenty of flexibility tendered, a third of it contracted, and almost none of it dispatched. Small assets like home batteries, heat pumps and EVs show the same gap.

31GWTendered
9GWContracted
22GWhActually used across the year

22 GWh is the 9 GW of contracted power running flat out for about two and a half hours. Source: Energy Networks Association, 2025.

A working definition

FlexOps is running flexibility as a continuous practice, not a project, with asset, market and business operations working from the same data.

Inside the paper

Four things your team can use

The definition

What FlexOps is, and what it is not.

The maturity model

Where your operation sits today, and the next step up.

The four metrics

The numbers that show whether flexibility is paying.

The anti-patterns

The traps that keep flexibility stuck in pilot.

The maturity model

Five levels. Where are you?

0Passive
1Monitored
2Dispatched
3Connected
4Autonomous

Most operators sit at level one or two. The jump to level three makes the biggest difference. The paper explains what each level looks like and what holds it back.

Download the full paper

The full model, the four metrics, the Romande Energie case and three first steps. It lands in your inbox straight away.

By submitting you agree to receive the FlexOps paper and related communications from Powernaut. Unsubscribe any time.